Alteration work
Contents |
[edit] Introduction
A building may need to be altered at some point after it has been constructed during its in-use period. This will necessitate alteration work.
Alteration work may be required for a wide range of reasons, including:
- Factors unforeseeable at the design stage, e.g new efficiency standards become possible.
- Total or partial change of use e.g an office block converted into housing.
- Change of ownership necessitating enlargement, extension or other changes.
- Failure of building components.
- Changing technological possibilities.
- Fashion
- Wear and tear.
Common examples of alterations include:
- Extension.
- Partial demolition.
- Linking or separating spaces.
- Making or closing openings.
- Retrofitting a new component or feature.
- Refurbishing an existing component or feature.
- Renovating an existing component or feature.
- Repairing an existing component or feature.
- Maintenance.
- Decoration.
Alteration work may be instigated by:
- The building owner.
- The building tenant (with the owner’s permission).
- The local authority (e.g if it needs to take urgent action or has instigated a compulsory purchase order).
- Central government (e.g. changes in regulations).
Alteration work can be complex and may involve higher design and construction fees than new build work. Appointing a designer or contractor to carry out the works may be on the basis of a firm that has successfully undertaken work in the past and is trusted by the client/building owner; or by inviting firms to tender for the work in an invitation to tender (ITT).
[edit] Permissions
Some alteration works may require planning permission while some may be considered ‘permitted development’ for which planning permission will not be required. The best way to determine whether a development is ‘permitted’ or not is to refer to the local planning authority.
Examples of permitted development include:
- Certain enlargements or alterations to houses.
- Construction of some sheds and fuel storage containers.
- Certain porches, doors and windows.
For more information see: Permitted development.
Alteration work may also require building regulations approval.
For more information see: Do the building regulations apply to works to existing buildings?
[edit] Variations
The term ‘alteration work’ as used in this article should not be confused with alterations to the scope of works of a construction contract, which are more commonly known as ‘variations’. Variations are changes involving addition, substitution, or omission to the original scope of the construction contract, and can affect the design, quantities, quality, working conditions or sequencing of the works.
For more information see: Variations.
[edit] Related articles on Designing Buildings Wiki
- Building regulations.
- CDM.
- Change of use class.
- Do the building regulations apply to existing buildings?
- Henry Boot Construction Ltd v Alstom Combined Cycles.
- International Existing Building Code (IEBC).
- Material change of use.
- Planning permission.
- Permitted development.
- Refurbishment.
- Renovation.
- Retrofit.
Featured articles and news
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).
Ebenezer Howard: inventor of the garden city. Book review.
The Grenfell Tower fire, eight years on
A time to pause and reflect as Dubai tower block fire reported just before anniversary.
Airtightness Topic Guide BSRIA TG 27/2025
Explaining the basics of airtightness, what it is, why it's important, when it's required and how it's carried out.
Construction contract awards hit lowest point of 2025
Plummeting for second consecutive month, intensifying concerns for housing and infrastructure goals.
Understanding Mental Health in the Built Environment 2025
Examining the state of mental health in construction, shedding light on levels of stress, anxiety and depression.
The benefits of engaging with insulation manufacturers
When considering ground floor constructions.
Lighting Industry endorses Blueprint for Electrification
The Lighting Industry Association fully supports the ECA Blueprint as a timely, urgent call to action.